Porirua roadworks: Pāuatahanui motorway exit to close for three days

Traffic on the roundabout and the Transmission Gully motorway at the Pāuatahanui interchange.
Supplied.

The southbound Transmission Gully exit at Pāuatahanui will close for three days from Tuesday 1 December.

The State Highway 58 ramp is due to shut at 2.30am on Tuesday and reopen at 4.30am on Friday 4 December. The closure runs day and night. Southbound drivers heading to Pāuatahanui or Haywards can reach SH58 by continuing to the Waitangirua Link Road interchange and following the signed detour.

NZ Transport Agency Waka Kotahi has scheduled the closure so crews can install drainage beside the ramp.

Southbound lane closures will also stay in place day and night between Paekākāriki and the SH58 interchange during the week. NZTA expects delays of around 10 minutes at peak times and is aiming to reopen all motorway lanes by 18 December.

Resurfacing will close a southbound lane between Waitangirua and Kenepuru from 9am to 6pm on Monday 30 November and Tuesday 1 December. A northbound lane will be closed north of Kenepuru from 5am to 3pm on Wednesday 2 December.

On SH58 at Judgeford, stop/go controls will operate between Moonshine Road and Flightys Road from 7pm to 5.30am on the nights of Sunday 29 November to Thursday 3 December. A changed lane layout remains in place during the day as well.

In Whitby, seawall repairs between James Cook Drive and Spinnaker Drive are scheduled under stop/go controls from 6am to 6pm, Monday 30 November to Friday 4 December. The working hours can change with the tide.

Drivers using SH59 should also allow time for stop/go controls at the Paekākāriki Link Road intersection from 9am to 5pm on weekdays. The work schedule can change in bad weather.

File photo: Jonathan Harker / Wikimedia Commons, CC BY-SA 4.0 (resized).