Transmission Gully delays and SH58 night works ahead for Porirua drivers

Workers and machinery repairing drainage beside a coned-off lane on Transmission Gully.
Drainage work on Transmission Gully. Photo: NZTA Waka Kotahi / Wellington Transport Alliance.

Porirua commuters can expect continuing southbound delays on Transmission Gully and five nights of stop/go controls on State Highway 58 during roadworks from 21 to 27 November.

Drainage work on Transmission Gully will keep southbound lanes restricted day and night from Saturday 21 to Friday 27 November, between Wainui Saddle and Rainbow Bridge and between Rainbow Bridge and the Pāuatahanui interchange.

NZTA says drivers are currently facing delays of up to around 10 minutes at peak commuting times. It advises considering SH59 as an alternative and checking electronic signs for route advice.

Around 30 percent of the drainage programme is complete. NZTA says work remains on track for all lanes to reopen by 18 December, with further pavement reconstruction planned for January.

On SH58 at Judgeford, safety improvements between Moonshine Road and Flightys Road will bring an altered lane layout from Saturday 21 to Friday 27 November.

Stop/go controls are also scheduled on that section from 7pm to 5.30am on Sunday 22 to Thursday 26 November nights. Each shift continues into the following morning, with the last due to finish on Friday 27 November.

Closer to Pāuatahanui, footbridge construction west of the Paekākāriki Hill Road roundabout is scheduled from 8am to 4pm, Monday 23 to Friday 27 November. Traffic may be held when required to manage pedestrian movements.

For drivers heading north on SH59, barrier installation and line marking at the Paekākāriki Link Road intersection will operate under stop/go controls from 9am to 5pm, Monday 23 to Friday 27 November.

Porirua residents travelling through central Wellington at night should also allow for the northbound Terrace Tunnel closure. Karo Drive upgrade work will close the tunnel from 9pm to 4.30am on Sunday 22 to Thursday 26 November nights.

NZTA asks drivers to use both lanes until merge points, merge like a zip and follow temporary speed limits. Work is weather dependent and may change at short notice. Check NZTA Journey Planner before setting off.